* Add in past end dates for testing
* Temporarily disable test marked to delete at year end
* Remove one off reinfer_local_authority task
* Update validator_spec
* Set 2024 date in form_handler_spec to be during crossover period as needed
* Use bulk_upload.year_combo for comparison in request tests to avoid year dependancy
* Update BU log creator specs for 2024
* Use year combo function in bulk upload mailer tests
* Refactor lettings validator_spec
* More fixes
* More work on bu validator specs - mostly sales
* Remove pre 2023 test
* More use of bulk_upload.year_combo in request tests
* Fix lint
* Tweak bulk upload error row component tests for year changes
* Further fixes
* Fix 2023 lettings row parser spec
* Sales log to csv fix
* Refactor BU processor tests
* Fix field number row identifier
* Fix linting
* More years in request spec
* fix
* Don't use db unnecessarily in financial validations spec
* Fix sale date changing 2024 -> 2023 test
* Add tests for bulk_upload.year_combo
* Update bu factory year specification
* Refactoring
* Linting
* Don't use helper in factory
* Remove new 2023 specific test
* Remove dummy end dates
* test prof in test context
* time reduced from ~1.4 to 0.27
* time reduced from ~1.1 to 0.7
* time reduced from ~0.13 to 0.07
* add testprof env variables to spec helper
* reorder gems for linting copmlaint
* Remove test-prof gem
---------
Co-authored-by: Kat <katrina@kosiak.co.uk>
* further fixes
* Fix date / crossover issues
* Try changing form end dates
* Revert "Try changing form end dates"
This reverts commit e027e29cf0.
* Make use of :ignore-validation-errors trait
* Try with end dates in past
* Revert "Try with end dates in past"
This reverts commit 6b87938d70.
---------
Co-authored-by: Rachael Booth <rachael.booth@softwire.com>
* Remove legacy user from user factory
* Build instead of creating in some model tests
* Do not create a new DPO for orgs created within user factories
* Add original setup doc
* Update documentation with updated factories
* Fix up DSA creations
* CLDC-3532: Make BU guidance back link depend on referrer
* Add tests for back_path
* Add guidance to homepage
* CLDC-3526: Update back_path
---------
Co-authored-by: Kat <katrina@kosiak.co.uk>
* update factory completed traits using an after build hook so that trait does what it says regardless of start or sale date of log
* use completed trait rather than completed2024 trait from factories
skip validation on saving logs from previous years so that logs created too far in the past do not trigger validations
* remove sale and start dates from logs in tests where that should not be important
build rather than create to reduce db interactions
in order that the setup is complete, build the necessary user and organisation with ids
* fix a wide range of tests affected by the changes in log factories completed traits
* initial spec file refactor
remove create for build, extract form to own variable, remove non-valuable tests
run time from 0.29s to0.11s
* refactor to ensure that the questions ownershipsch instance variable and the value of ownershipsch on the log is the same in tests
* delete page test file which is not testing anything meaningful
* add error messages to the I18n yml
* update tests for the validations
* update validation logic
* update tests for the mortgage used question
* update the mortgage used question displayed answer options
* update bulk upload specs to reflect error message updates
* make use of brackets consistent within validation method
* CLDC-3487: Clear previous_la_known when necessary for renewal logs
* CLDC-3487: Clear location when clearing scheme due to org change
* CLDC-3487: Use nil instead of 0
* Specify orgs on sh logs when needed for tests
* Fix flaky tests
* ensure in the update method that it is not possible to delete rent periods that are in use by that organisation
* lint
---------
Co-authored-by: Kat <katrina@kosiak.co.uk>
* CLDC-3463: Fix bug with vacdays calculation
* CLDC-3463: Fix lettings csv export tests
* Lint
* Use build_stubbed where necessary for lettings logs in tests
* Update all logs in rake task but without validation
* Try validations in rake tasks and log when needing to skip them